Controlled concrete demolition removes slabs, walls, plinths and machine bases by cutting them into sections and lifting them out. Cutting causes less vibration and noise than breaking concrete in place, and the structure around the removed section stays intact.

Cut & lift
METHOD
Low
VIBRATION
Diamond saws and core rigs
TOOLS
GPR scan of the area
BEFORE CUTTING
What controlled demolition is used for
MOST COMMON JOB
Slab sections for new openings and voids
Cut & lift
Internal walls during fit-out and refurbishment
Plinths and machine bases
Damaged or redundant concrete
Partial removal next to occupied areas
When to choose controlled demolition
Choose cutting when the concrete around the removal must stay sound, when vibration could disturb an occupied building or sensitive equipment, or when noise limits apply. Breakers are faster for full demolition. Controlled cutting suits partial removal inside a working structure.
Slab removal
Wall removal
Plinths
Machine bases
Fit-out works
Refurbishment
Occupied buildings
Sensitive equipment
How controlled demolition works
01
Scan
We scan the area with GPR and mark rebar, PT cables and conduits.
02
Plan
Cut lines and section sizes are set so each piece can be lifted safely.
03
Cut
Diamond saws and core rigs cut the concrete into sections.
04
Lift out
Sections are lifted out and the area is cleared.

Our demolition equipment
Diamond wall saws, floor saws and core rigs cut the sections. After demolition, sections can be lifted using a crane or boom loader.
Planning controlled demolition
Section size depends on the lifting equipment and access. Removing load-bearing concrete needs temporary propping and approval from the project structural engineer before cutting starts.
WORKS WELL
Partial slab removal
Internal walls
Plinths and bases
NEEDS PLANNING
Load-bearing elements
Post-tensioned slabs
Heavy sections in tight spaces
Concrete demolition cost in Dubai
A
Volume of concrete
B
Number and size of sections
C
Lifting and access
D
Removal and disposal
Send drawings or photos of what has to come out, and we will confirm a price and a date.
Scanning, coring and cutting from one contractor
The same company scans, cuts and lifts, so the demolition crew works from our own technician's marks.
Concrete demolition FAQs
What is controlled concrete demolition?
Removing concrete by cutting it into sections and lifting them out, so the structure around the removed part stays intact.
Is controlled demolition quieter than breaking?
Yes. Cutting causes less vibration and noise than hydraulic breakers, which suits occupied buildings.
Do I need a structural engineer?
For load-bearing slabs, walls or beams, yes. The engineer approves the cut plan and any temporary propping.
Do you offer concrete demolition outside Dubai?
Yes, across Abu Dhabi, Sharjah, Ajman and Ras Al Khaimah.
Do you remove the cut concrete from site?
Debris removal is available as an optional service and will be charged additionally.
Request a quote
Send drawings or photos of what has to come out. We will confirm a price and a date.